There are 2 charging stations, 220 volts single-phase socket and 380 volts three-phase socket, at your disposal towards the rear of the parking lot.
The maximum allowed power is 21 kWh.
If desired, an access badge can be issued ; there will be a 50 € deposit to cover the cost of a lost or stolen badge.
Le Clos des Rives invested 7000 € (70% of installation cost); the French Goverment offered a 3000 € subsidy (30% of installation cost) through the ADVENIR grant.
Billing : 5 € pluging fee then 0.25€ per kWh used with your personal badge at the charging station
We ask you to be respectfull of other residents. Once your car is fully charged you’ll have an hour to move your vehicle, after that you will be fined 10 € per hour ; with the exception of overnight charging from 10 PM TO 10 AM.
We must enforced this rule in order to ensure the accessibility of the charging station to everyone.
Parking n° 6 may use the charging station, if it is available, same rule will aplly.
Green light= charging station available
Please contact the reception if both red lights are on.